Hitachi Vantara Pentaho Community Forums
Results 1 to 1 of 1

Thread: Pentaho Logging with nested jobs adds confusion

  1. #1
    Join Date
    Dec 2010
    Posts
    193

    Question Pentaho Logging with nested jobs adds confusion

    Hi,

    I have a master job A, which has child jobs B,C,D and E. We are logging the tables into postresql 8.2 version table as below,

    Job A,B, C,D, E -- Enabled job level logging and loaded into same table A
    Inside the child jobs , we have enabled transfomation level logging and step level logging which are loaded into respective tables.

    Now the problem is,ideally if the master table fails , it shold show a combination of errors count in the log table. But here it is not the case.

    Consider , Job B has failed and Job C has succeeded. My audit table entry has following values,


    Job A- status end - errors(some int value)
    Job B - status end or stop - error - null
    Job C - stop errors -nulll

    Refer attachments.
    I am not sure how it works . Please guide me.

    I need to track the master job status along with child jobs in one single run . If anyone of the child job fails then that job status and errors shuould be tracked and the it should reflect in master job status.
    Attached Images Attached Images    
    Attached Files Attached Files

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.