Hi All,

I have an insert / update step in one of my jobs and a 'lastupdate' field on one of my db tables.

I'm wondering if I can edit my parameters to use that lastupdate field and run based on the last time the job was ran. Is there a specific synatax I can use in that "Default Value" section?

Thanks in advance for your help.

John B