Hitachi Vantara Pentaho Community Forums
Results 1 to 2 of 2

Thread: Ways of executing a Job Entry/Transf twice

  1. #1

    Default Ways of executing a Job Entry/Transf twice

    What are the considerations and differences in PDI on these four ways of executing twice a transformation?

    1.- Drag and drop it twice
    2.- Create a Shallow copy
    3.- Pointing both control flows to the same box
    4.- Copy ktr file if possible and import it again

    Which ones are exactly the same?


    Thank!

  2. #2

    Default

    I'm sure I ask too much, but it would be a tremendous guideline insight for all of those we need to become specialists in kettle

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.