Hitachi Vantara Pentaho Community Forums
Results 1 to 3 of 3

Thread: Forecasting method required in Weka

  1. #1

    Default Forecasting method required in Weka

    (1)What analyses method would be the best to analyse a 20 years range numbers ?
    How to forecast with at least 99 % conf level. What method to use ? J48 ?

    (1a). I believe that any range of numbers has a structure. How to find that structure?

    (2) What should the format of my range (numeric or text) .When I open the Trees method, the J48 classification is grey.Why is that?
    Last edited by Forecast_study; 04-27-2017 at 10:43 PM. Reason: additional questions

  2. #2
    Join Date
    Aug 2006
    Posts
    1,741

    Default

    I'm not sure exactly what your application is. If the variables are all numeric then you will need to use a regression scheme such as linear regression or M5P (regression/model trees). J48 can only operate on data with a nominal target field.

    Cheers,
    Mark.

  3. #3

    Default

    Hello Mark ,
    Thank you for your answer.
    all variables are numerical. My challenge is now to determine the structure of N a how it forecasts the next demand with 99% conf.
    In the Classifier evaluations options I have:
    output predictions a :NULL
    Random seed for xVal /split : 1
    In the test options: cross validations folds 10 (my data contains 35 years demand)
    What would be your advise to set the analyses parameter's?

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.