Hitachi Vantara Pentaho Community Forums
Results 1 to 3 of 3

Thread: Dummy step reporting failure

  1. #1

    Default Dummy step reporting failure

    I have a job with a simple evaluation. If the variable it is evaluating is 1, it reports success and runs a transformation. If it is zero then I have the error running a dummy step. Problem is that the job metrics reports a failure for that job and I want it to report a success even though the evaluation "failed". There are no errors in the log but the job reports "false" under "finished job entry". Basically the variable is set in a config file and allows the user to decide which transforms to turn on and off.

  2. #2

    Default

    Basically it is the simple evaluation step which makes the job fail if it "fails". I just want to use it to decide which step to continue to, without giving a failure message. Version is 7.1, BTW.

  3. #3
    Join Date
    May 2016
    Posts
    280

    Default

    What do you have after the dummy step when the evaluation is false? If you create a hop to the End Success step the job would not finish as failed.
    Regards
    OS: Ubuntu 16.04 64 bits
    Java: Openjdk 1.8.0_131
    Pentaho 6.1 CE

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.