    I have two jobs that need to run in sequence - one after the other - with a time spacing of 30 min.

    The first job is set at, say for e.g. 1.00 am PST
    The second job is set to run at, 1.30 am PST

    these two jobs need to run on a daily basis on the sequence mentioned above.

    The problem I am facing is - in the first cycle both the jobs run at the time defined. When it comes to the second cycle, (i.e second iteration), the second job adds another half hour to it's set time and run at the same time as the first one.

    Sounds weird, but true...

    any one faced this issue before...

    Thanks for your time...

    Singa

  2. #2
    Join Date
    May 2006
    Posts
    4,882

    Default

    Double clicon the start icon of the jobs and see whether "scheduling" is disabled there.

    Next which kind of scheduling do you use?

    Regards,
    Sven

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.