    Hi - I am not sure if I correctly understand how jobs work. Steps of a job are connected using hops for which one can specify evaluation criteria of 'unconditional', follow 'when result is true', 'follow when result is false'.

    I had assumed that this related to successful / failed completion of prior step. This does not appear to be correct. I had a situation in testing yesterday where a step failed, and the job continued.

    Could you please shed some light on how the job hops work and how to specify that a job should stop on error / failure.

    As an FYI - the job referenced above had two steps. First that loaded data from file into staging table. Second performed validation of the loaded data. The load failed due to a constraint however validation step executed.

    Thanks.

  2. #2
    Join Date
    May 2006
    Posts
    4,882

    Default

    I had assumed that this related to successful / failed completion of prior step. This does not appear to be correct. I had a situation in testing yesterday where a step failed, and the job continued.
    It should be related to successful/failed completion. But it depends on what the step considers success/failure. Try to make the simplest job that shows your problem and make a jira of it.

    Regards,
    Sven

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.