    Question Controlling the Target Load

    hi,

    I have 2 target tables in a single transformation. I want target2 to be loaded only after the completion of target1.

    Is there a way to control the sequence of loading the targets?

    Thanks,
    Vasanth

  2. #2
    Join Date
    May 2006
    Posts
    4,882

    Default

    If the targets are on the same data you can put a blocking step between both outputs.
    If they're on totally different data the easiest is probably to split the transformation in 2 or 3 parts.

    3 parts:
    - Get data and land them (in file, binary format, ...)
    - Load table 1 from landed data
    - Load table 2 from landed data

    Regards,
    Sven

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Privacy Policy | Legal Notices | Safe Harbor Privacy Policy

Copyright © 2005 - 2019 Hitachi Vantara Corporation. All Rights Reserved.